Build Log

SectionHours
6 - Vertical Stabilizer - Done15.5
7 - Rudder Assembly - Done36
8 - Horizontal Stabilizer - Done58
9 - Elevator Assembly - Done72.25
10 - Aft Fuselage - Done85
11 - Empennage Attach 7
12 - Empennage Fairings0
13 - Main Spar30.75
14 - Wing Ribs50.25
15 - Rear Spar24.25
16 - Top Skins21.25
25 - Fuse Bulkheads - Done31
26 - Mid-use Lwr Structure - Done32.5
27 - Firewall - Done21
28 - Fwd-fuse Lwr Structure - Done30.5
29 - Fwd-fuse Sides - Done93.25
30 - Aft Fuse Attach - Done16.75
31 - Fuel System - Done7
32 - Baggage Area - Done24.5
33 - Rudder & Brake Systems - Done20.5
34 - Flap Motor - Done8
35 - Upper Fwd Fuselage - Done43
36 - Aileron & Elevator Systems - Done22.25
37 - Roll Over Structure - Done15.75