| 6 - Vertical Stabilizer - Done | 15.5 |
| 7 - Rudder Assembly - Done | 36 |
| 8 - Horizontal Stabilizer - Done | 58 |
| 9 - Elevator Assembly - Done | 72.25 |
| 10 - Aft Fuselage - Done | 85 |
| 11 - Empennage Attach | 7 |
| 12 - Empennage Fairings | 0 |
| 13 - Main Spar | 30.75 |
| 14 - Wing Ribs | 50.25 |
| 15 - Rear Spar | 24.25 |
| 16 - Top Skins | 21.25 |
| 25 - Fuse Bulkheads - Done | 31 |
| 26 - Mid-use Lwr Structure - Done | 32.5 |
| 27 - Firewall - Done | 21 |
| 28 - Fwd-fuse Lwr Structure - Done | 30.5 |
| 29 - Fwd-fuse Sides - Done | 93.25 |
| 30 - Aft Fuse Attach - Done | 16.75 |
| 31 - Fuel System - Done | 7 |
| 32 - Baggage Area - Done | 24.5 |
| 33 - Rudder & Brake Systems - Done | 20.5 |
| 34 - Flap Motor - Done | 8 |
| 35 - Upper Fwd Fuselage - Done | 43 |
| 36 - Aileron & Elevator Systems - Done | 22.25 |
| 37 - Roll Over Structure - Done | 15.75 |